Baldor TS35 Manuel de l'opérateur Page 18

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 55
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 17
15
OPERATION STARTING
1. Conduct Prestart Procedures.
2. Switch the generator set to the applicable voltage setting.
3. Connect the load(s) to the circuit breaker.
WARNING: High voltage is present when the generator set is running.
4. Move the Master Control Switch to the appropriate position.
5. Adjust the voltage if necessary by turning the voltage adjustment knob located on the control panel.
Vue de la page 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 54 55

Commentaires sur ces manuels

Pas de commentaire